COST OF FACILITY

There were three cost components that together contributed to the sitting day fee that was paid by the parties.

The cost components were:

  • Infrastructure
    Representing the supply of the equipment included in the facility provided by Systematics.

  • Support and Operation Services
    Including the service fees for all on-going services provided by Systematics.

  • Development and Decommissioning
    Representing services and other costs relating to the design, development, building and dismantling of the facility.

If the same facility was installed on a permanent basis to allow use for multiple cases over time, the cost associated with its provision could be reduced dramatically with the "Development and Decommissioning" component essentially being removed.